How much does it cost to install an EV charger at home?
What a fitted 7kW smart charger costs in the UK, what a quote can add on top, and how grants change the bill, all from prices published and checked on 10 October 2026.
Updated 10 October 2026Facts checked 10 October 2026 against primary sources13 min read

The short answer
- Charger + standard install (7kW smart, single-phase)
- £949–£999
- Cheapest published: £720. Upper end for a standard job: about £1,500.
- Install only (you own the charger)
- £399–£490
- Median £450 across five published prices.
- Extra cable beyond the included run
- £10–£20 a metre
- Included length is 5m to 15m depending on the provider.
- Trenching across a drive or garden
- £200–£500
- Soft ground, short run. Hard surfaces cost more.
- New consumer unit, if needed
- £350–£1,000
- Wide spread between installers.
- Main fuse upgrade or unlooping
- Usually free
- The network operator pays for standard work. Three-phase is the costly exception.
- OZEV grant (eligible households)
- 75% up to £500
- Renters, flat owners and on-street households. Not owner-occupied houses with a driveway. Ends 31 March 2027.
These are published prices checked on 10 October 2026, not quotes. Most are “from” prices for the simplest job, so treat them as floors.
Figures checked on 10 October 2026.
Every figure here comes from a price a supplier, installer or consumer guide had published when we checked on 10 October 2026. We have not been quoted for a job, and most of the numbers are “from” prices for the simplest installation. Your own quote can differ for good reasons, which this page explains item by item.
Estimate your own cost
Pick where you park and roughly how far the charger will sit from your fuse box.
Estimated price, including VAT
£850–£1,230
- Smart charger + standard installation£850–£1,100
- Cable run of 5–15 metres£0–£125
Based on published UK installer prices checked 10 October 2026.
The estimator uses a planning range of £850 to £1,100 for a charger and standard install, plus the distance, parking and ownership you choose. That range is a little wider than the typical £949–£999 below, so it covers the cheaper independents and the dearer regional offers. For a firm figure you need a survey; our free quote service arranges that.
What a standard installation costs
A standard installation means the charger supplied and fitted: survey, a 7kW smart charger, a dedicated circuit with protection, a cable run up to the provider’s included length, mounting on a brick or rendered wall, testing, the certificate and DNO notification. It excludes groundworks, a new consumer unit, network work and three-phase.
Across 15 published entry prices, the cheapest is £720, an EVEC unit from Charge EV North West. Its VAT basis is not stated and it is not like-for-like with premium smart chargers. The bottom of the typical range, £949, is the median of those 15 prices. The top, £999, is the median of the five national suppliers’ entry prices (Octopus, OVO, British Gas, Pod and Ohme) and the most common headline price. One of the 15 entries (Faithful Spark £900) is quoted ex-VAT (about £1,080 inc VAT). Grossing it up moves the median from £949 to £982.50 (computed), so treat £949-999 as the honest range.
Independent guides land in the same place, though some pages still carry outdated grant details.
| Source | Published | What it says |
|---|---|---|
| Which? | 25 February 2026 | “it now typically costs between £500 and £1,200 to buy and install a home EV charger” |
| Checkatrade | April 2026 | “typically costs around £1,000, or £500 if you're eligible for a government grant” |
| MyBuilder | 21 August 2026 | “A standard 7kW installation is around £800-£1,200, with the unit and labour included” |
| Rated People | 8 April 2026 | “typically falls between £800 and £1,500” |
What consumer guides say about a 7kW charger, fitted. Quotes as published. Source: published provider prices, checked 10 October 2026.
The top of a standard job is about £1,500, Rated People’s upper bound. Fixed national offers stop lower: the dearest in the table below is £1,430 (Andersen EV). Anything above about £1,500 usually means one of the extras further down.
What the standard price includes
Providers consistently leave out groundworks, a new consumer unit, network work, a pedestal and anything beyond the included cable length. That last item is the biggest difference between like-sounding offers. Here is how far each provider’s standard price runs:
- 5m: Charge At Home, LAMPS
- 10m: Octopus Energy, OVO, Hypervolt standard (EVC Experts), Bristol Phoenix Group
- 15m: Pod / EDF, Ohme (approved installers), Andersen, Eco Wizard / Aero
- not published: British Gas
National provider prices
These are the fitted prices shown on each provider’s own pages on 10 October 2026, cheapest first. The Octopus rows are the London, South East and North East price; other regions differ (see below).
| Provider | Product | Price | VAT basis |
|---|---|---|---|
| OVO Energy | myenergi zappi (from) | £949 | inc ('All prices include VAT') |
| British Gas (Hive) | Sync Energy Wall Charger 2 (from) | £999 | not stated |
| Pod (EDF group; formerly Pod Point) | Solo 3S untethered | £999 | not stated |
| Ohme (direct, via approved installers) | Home Pro (from) | £999 | not stated |
| Octopus Energy | Octopus Charge untethered (no holster) | £1,029 | inc (T&Cs 12.1) |
| Octopus Energy | Ohme Home Pro 5m | £1,199 | inc |
| Octopus Energy | Hypervolt Home 3 Pro 5m | £1,249 | inc |
| Andersen EV | Andersen A3 + installation (computed) | £1,430 | not stated |
| myenergi | zappi (charger only, from) | £779 (charger only) | inc VAT 'if applicable' |
National suppliers and manufacturers. Prices include standard installation unless marked charger only. Source: published provider prices, checked 10 October 2026.
Andersen’s figure is our arithmetic (charger plus its installation line), not a price Andersen publishes as one number. Where the VAT basis says “not stated”, ask the provider whether the price includes VAT.
Independent installers
Independent installers list entry prices from £720 (Charge EV North West) to £1,100 (Severn Sparks). These are mostly undated “from” prices for the simplest job, often on a different charger, so read them as spread rather than a league table. Lilliput Electrical states it is not on the OZEV authorised list, so it cannot claim the grant for you, which matters if you are eligible.
Installing a charger you already own
Published install-only prices run from £399 to £490, with a median of £450. They come from Eco Wizard / Aero, Andersen, Lilliput Electrical, LAMPS, Charge EV North West. Only two are explicitly for a charger bought elsewhere (Lilliput and Charge EV North West), so this range is thinner evidence than the fitted prices above. LAMPS’s figure excludes VAT, which would make it about £587 including it (computed). Labour benchmarks are £45–£78 an hour.
Extras, itemised
Each extra below shows the published range and when it applies. A good quote lists any that apply to your house before work starts.
Cable, groundworks and mounting
| Extra | Published price | When it applies |
|---|---|---|
| Extra cable beyond the included length | £10–£20 per metre | Your charger is further from the consumer unit than the installer allows for. Included runs are listed above. |
| Octopus cable tiers | £125–£350 flat fee per tier | Octopus sells flat tiers (up to 20m, up to 30m, beyond 30m) instead of a per-metre rate. |
| Extra trunking or conduit | £6 per metre | The run needs more protection than the 3m (Pod), 6m (Ohme) or 7m (Andersen) usually included. |
| Trenching across a drive or garden | £200–£500 per job (soft ground, short run) | The charger goes on a detached garage, a far wall or a post. Hard surfaces are quoted individually, and Octopus, OVO, Andersen and Severn Sparks exclude groundworks. |
| Extra wall penetrations | No published price | The cable must pass through more than one wall. One wall is included at Ohme, Andersen and Pod (up to 500mm). We found no consumer price per hole. |
| Charger post or pedestal | £475 per post (groundworks extra) | There is no suitable wall. Octopus lists the post as an extra, and the groundworks to fix it cost more. |
Published prices, checked 10 October 2026. VAT basis varies by source.
Electrical work in your home
| Extra | Published price | When it applies |
|---|---|---|
| Consumer unit (fuse box) replacement | £350–£1,000 per job | Your board is old, full, has no RCD protection or cannot take an RCBO. Pod and Severn Sparks include a small extra unit when needed, which is not a full replacement. |
| New isolator or main switch | £100–£200 per job | Often required, says Checkatrade. Octopus asks for a fused isolator if the consumer unit is over 3m away or the meter-to-unit cable changes. |
| Earth bonding fix | £100 per service (older data) | Missing or inadequate bonding found on the day. The figure is from one installer table (December 2024), so treat it as indicative. |
| Earth rod (TT earthing) | £80–£400 per job | Only if the charger lacks open-PEN protection and the supply needs it. No installer publishes a price list and trade estimators disagree, so this is low confidence. |
| Open-PEN protection built into the charger | Included | Standard in the mainstream smart chargers sold by Octopus, OVO, Pod, Ohme, myenergi and Hypervolt installers. Check the spec sheet on a cheaper unit. |
| Surge protection device (SPD) | £50–£52 per job (inc VAT) | Eco Wizard sells it separately and Severn Sparks includes a Type 2 SPD. myenergi says the zappi's own surge protection does not replace a separate device. |
| CT clamp for load balancing or solar | £30–£50 per clamp (DNO estimate) | Usually already in the box or the standard install (zappi, Ohme Home Pro, Hypervolt). The range is the DNOs' estimate if bought separately. |
Published prices, checked 10 October 2026.
The consumer unit range is wide because installers define the job differently, from a small six-way board to a larger one, and some quote with VAT while others do not.
Earth rod or PEN device? Most UK homes have PME earthing, and the wiring regulations (BS 7671 reg 722.411.4.1) do not allow it to feed an outdoor charge point unless the charger or a separate device protects against an open-PEN fault, or an earth electrode is fitted. Most mainstream smart chargers (zappi, Ohme Home Pro, Hypervolt and others) have that protection built in, which is why an earth rod is usually not needed. Not all do. Tesla’s Wall Connector has none, so installers add an external device to the quote; see its review for the unit price. Our PEN fault and earthing guide explains the options.
Network (DNO) work
| Extra | Published price | When it applies |
|---|---|---|
| Main fuse (cut-out) upgrade | £0–£200 per job | Old cut-out or high new demand. UK Power Networks upgrades 30A or 60A fuses to 80A or 100A free of charge; Northern Powergrid says "in most cases". Costs are agreed with the DNO first. |
| Unlooping a shared supply | Normally free to you | Your supply is shared with a neighbour, so you apply before installing. It takes 3 to 12 weeks if uncomplicated and up to six months to a year with neighbour disputes. |
| Three-phase supply upgrade | £1,500–£5,370 per job (some quotes far higher) | Only for 22kW or an unbalanced load, and you pay. The top of the range is the average SP Electricity North West publishes; installers quoted Citizens Advice a similar span. |
| DNO application or connection fee | Nil for a standard job | A standard charger on an adequate supply: UK Power Networks says there is nothing to pay. |
Published prices, checked 10 October 2026. DNO means distribution network operator.
No DNO publishes a fuse-upgrade fee. Citizens Advice found one £200 “assessment and design fee” and isolated cases of customers being charged for unlooping, and its survey found 22% of people with a low-carbon technology needed a fuse upgrade. Forum quotes of “several hundred pounds” cited by DESNZ are anecdotal. Since 1 April 2023 EV chargepoints are not charged for network reinforcement. Three-phase is rarely worth it for a home charger, because 7kW single-phase covers most needs; see 7kW vs 22kW.
Charger options and fees
| Extra | Published price | When it applies |
|---|---|---|
| Tethered instead of untethered | £30–£100 price difference | The difference for the same model at Pod, Octopus Charge, Severn Sparks and Charge EV North West. |
| Longer tethered lead | £34–£100 per upgrade | OVO sells longer Hypervolt leads; Octopus sells longer Ohme and Hypervolt ones. |
| Extended warranty | £79–£100 per upgrade | Octopus Charge and Hypervolt (through Octopus) sell a five-year option. |
| In-person survey | £60–£99 per survey | Remote photo surveys are free at most national suppliers. Eco Wizard and Pod Drive charge; many independents survey free. |
| Additional labour | £45–£78 per hour | Time beyond what the package allows (three to four hours is typical). |
| Rescheduling the install date | £0–£250 per change | Octopus's terms allow a fee for changing an installation date. |
| Remote-area surcharge | No published price | OVO publishes a postcode list but no figure. Faithful Spark charges a small amount for remote rural addresses. |
Published prices, checked 10 October 2026.
We found no current consumer price for a Henley block or meter-tail upgrade (British Gas says tails need upgrading when a fuse goes to 100A), a separate RCBO, an out-of-hours surcharge or removing an old charger. Treat any figure you are given for those as installer-specific.
Regional differences
The best like-for-like evidence is Octopus, which sells the same chargers at three regional price points. London, the South East and the North East pay the same. East Anglia and the South Coast pay £30 to £100 less, and Scotland and South Wales pay £50 more. So London is not automatically the dearest.
| Model | London, SE, NE | East Anglia, South Coast | Scotland, South Wales |
|---|---|---|---|
| Octopus Charge untethered | £1,029 | £999 | £1,079 |
| Octopus Charge tethered 5m | £1,129 | £1,099 | £1,179 |
| Ohme ePod | £1,149 | £1,049 | £1,199 |
| Ohme Home Pro 5m | £1,199 | £1,099 | £1,249 |
| Hypervolt Home 3 Pro 5m | £1,249 | £1,149 | £1,299 |
Octopus Energy fitted prices by region, inc VAT. Postcode-to-region mapping is not published. Source: Octopus sales page data, 10 October 2026.
Tradespeople tell a different story. MyBuilder says London and South East electricians charge 10% to 20% more, and Which? says prices are likely to sit at the upper end there for general electrical jobs. Independent installers’ prices vary widely by area, but they cover different chargers, so they do not make a league table. In Northern Ireland the OZEV grants apply, and NIE Networks assesses your supply before the install rather than being told afterwards.
How grants reduce the bill
Since 1 April 2026 the OZEV home chargepoint grant pays 75% of the cost up to £500 per socket. It is open to renters, flat owners with private off-street parking, and households with only on-street parking that will fit a permanent cross-pavement solution. It is not available to owner-occupiers of a house with a driveway. It runs to 31 March 2027, described as a final year.
You apply first, wait for OZEV’s eligibility notice (up to 10 working days), then install with an OZEV-authorised installer, who deducts the grant from your invoice. On a £999 fitted charger the grant is £500, leaving £499 (computed). A full grant needs a total cost of at least £667. The on-street grant pays towards the charger, not the channel, whose resident price runs from £250 to £1,425 depending on the council; the whole project works out at about £850 to £2,050 after the grant. Eligibility, the application steps and the no-driveway numbers are on the grants page and in our no-driveway guide.
How to keep the cost down
Choose a charger with built-in open-PEN protection. It avoids a separate device or earth rod. Our best home EV chargers roundup and charger reviews say whether each model has it.
Keep the run short. Every metre beyond the included length costs £10–£20, and a charger on the wall nearest the consumer unit often stays inside the included run.
Compare like with like. Ask each installer for the included cable length, whether VAT is in the price, what happens if a consumer unit or earth electrode is needed, and whether network notification is covered. If a quote carries a DNO charge for standard fuse or unlooping work, ask why.
Check the grant first, and choose tethered or untethered deliberately. A charger bought elsewhere can make the install ineligible. The tethered premium is £30–£100; our tethered vs untethered guide helps you choose.
VAT on the charger and the installation
We work on the standard 20% rate. Chargepoints do not appear in HMRC’s list of energy-saving materials charged at 0% until 31 March 2027, though HMRC never says in terms that they are standard-rated, so this is a conclusion by absence. Providers are not consistent: some state VAT is included (Octopus, OVO, Eco Wizard), some exclude it (Bristol Phoenix’s headline, Faithful Spark, LAMPS) and most do not say. Grants are worked out on the VAT-inclusive cost.
The temporary 0% rate on domestic electricity in Great Britain, from 1 October 2026 to 31 March 2027, applies to the electricity you buy, not the charger. We assume it covers home EV charging on a domestic supply, but HMRC’s brief does not mention EVs.
The price of the charger is not the cost of charging
The installation is a one-off. What you pay per mile afterwards depends on your tariff and when you charge. Our home charging cost guide and charging cost calculator cover that separately.
How reliable are these numbers?
The national suppliers’ prices are the firmest, because each was read from the provider’s own page. Independent pages are often undated, earth rod prices come from trade estimators that disagree, and Octopus’s postcode-to-region mapping is not published. Where we could not find a number, the table says so rather than guessing. We re-check this page every quarter, and sooner when grants change.
Ready to see how your house compares? Request your free quotes, or read how installation works from survey to certificate.
Questions people ask
How much does it cost to install an EV charger?
How much does an electrician charge to install an EV charger in the UK?
What is the cheapest way to get a home EV charger installed?
Can I get a free EV home charger?
Is there VAT on EV charger installation?
What is included in a standard EV charger installation?
Sources
- Explore our EV chargers (regional price data embedded in page), Octopus Energy (read 10 October 2026)
- EV installation terms and conditions (Apr 2026), Octopus Energy (read 10 October 2026)
- Smart EV charger installation, OVO (read 10 October 2026)
- EV charger terms v1 (last updated Sep 2026), OVO (read 10 October 2026)
- Home EV charger installations with Hive, British Gas (read 10 October 2026)
- Solo home EV charger, Pod (read 10 October 2026)
- Installation, Pod (read 10 October 2026)
- Our chargers, Ohme (read 10 October 2026)
- Installation, Andersen EV (read 10 October 2026)
- Charge EV North West, Charge EV North West (read 10 October 2026)
- Hypervolt Home 3 Pro (installation tab), Eco Wizard (read 10 October 2026)
- Electric car charging at home (25 Feb 2026), Which? (read 10 October 2026)
- How much do electricians cost? (1 May 2026), Which? (read 10 October 2026)
- EV charger installation cost (Apr 2026), Checkatrade (read 10 October 2026)
- EV charger installation cost (updated 21 Aug 2026), MyBuilder (read 10 October 2026)
- How much does it cost to install an EV charger at home (8 Apr 2026), Rated People (read 10 October 2026)
- What do you need to upgrade?, UK Power Networks (read 10 October 2026)
- Electric vehicles, Northern Powergrid (read 10 October 2026)
- Connecting a single EV charging point, SP Electricity North West (read 10 October 2026)
- Unlooping electricity network connections: research summary (2026), DESNZ / Eunomia (read 10 October 2026)
- Navigating the Network (2026), Citizens Advice (read 10 October 2026)
- Connecting electric vehicles and heat pumps, Energy Networks Association (read 10 October 2026)
- VAT Notice 708/6: energy-saving materials and heating equipment, HMRC (read 10 October 2026)
- Revenue and Customs Brief 10 (2026): temporary zero rate of VAT for domestic electricity in GB, HMRC (read 10 October 2026)
- Changes to EV chargepoint grant schemes from 1 April 2026, GOV.UK (read 10 October 2026)
- EV chargepoint grant for renters and flat owners, Find a Grant (GOV.UK) (read 10 October 2026)
- Connecting electric vehicle chargepoints to the electricity network (16 Jun 2021), GOV.UK (read 10 October 2026)
- Tesla Wall Connector, Mr Charger (read 10 October 2026)
Read next
- EV charger installation in the UK: how it works, what it costsHow home EV charger installation works in the UK: survey, what is included, how long it takes, what it costs and how to find a competent installer.
- EV charger grants in the UK: who qualifies in 2026Who can claim the OZEV EV charger grant in 2026, how much it pays, which homes qualify (flats, renters, on-street) and how to apply through an installer.